Neom Logistics Hub Reaches Structural Completion
INFRASTRUCTURE

Phase one of the Neom Axis Logistics Hub is now officially complete following the successful lift and positioning of the modular central node. This critical component serves as the structural anchor for the facility's northern wing, requiring the coordinated effort of ten deployed VT-800 ultra-rise units.
During the six-month deployment, the Vertic fleet operated under intense thermal fluctuations and abrasive desert conditions. Despite these environmental challenges, our maintenance protocols ensured 100% operational uptime. The integrated lift-grid software allowed the team to manage complex load moments across all units simultaneously.
With the core skeleton now secured, the next stage of development focuses on internal system integration. The VT-800 fleet is scheduled for phased decommissioning and relocation to support upcoming infrastructure projects across the region's expanding industrial corridor.
Contact
PARTNER WITH VERTIC
Connect with our specialized structural engineering and logistics department. We manage the physics of vertical ascent to ensure your infrastructure reaches peak capacity.
